Panel production
ERGIO manufactured the timber structure as separate factory-prepared panels.

Spain · Residential · Modular Timber
A 126 m² residence composed of four prefabricated timber modules, produced as separate ERGIO panels and assembled into complete modules before final installation on site.
Project overview
Tomino, in the province of Pontevedra, is composed of four modules. ERGIO produced the timber structure as separate prefabricated panels, which were then joined into complete modules in a factory in Spain.
After module assembly, the units were transported to site and connected into a balanced, modern 126 m² home. The joining process took only a matter of days, demonstrating how modular construction can compress site time while maintaining dimensional coordination.

Modular strategy
The project separates production, module assembly, transport and final site joining into controlled stages.
ERGIO manufactured the timber structure as separate factory-prepared panels.
The panels were joined into four complete modules in a Spanish factory.
Completed modules were transported to the final residential site.
The four units were connected together in a matter of days.
Why this project matters
Tomino shows how a larger residential footprint can be broken into transportable, repeatable units without losing architectural coherence.
Panel and module connections are resolved before the units reach the site.
Most assembly work is shifted away from the final building location.
Factory production helps the modules fit together accurately during final installation.
The same modular workflow can support repeated residential or multi-unit programmes.






Factory-to-site workflow
The defining strength of Tomino is the sequence: precise panel fabrication, controlled module assembly, transport and rapid final joining.
The project is translated into panel-level manufacturing information.
ERGIO manufactures the timber components as coordinated panels.
Panels are assembled into four transportable modules in Spain.
The modules are positioned and connected on site to complete the residence.
Project-specific timber engineering.
Send the architectural and structural information. ERGIO can review the project and translate it into a factory-prepared timber package for predictable assembly.