Completed project · United Kingdom · Timber Frame

Canings Shop

A compact UK timber project delivered with the same engineering discipline and factory control applied to larger structures.

At handover, the keys passed to the client and the project formally became part of the local landscape. Behind the compact footprint sits a fully coordinated timber-frame envelope designed for reliable execution and consistent quality.

United KingdomTimber FrameCompleted45 × 145 mm exteriorFactory-controlled
Exterior frame45 × 145 mm
Interior frame45 × 95 mm
External finish28 mm vertical cladding
MarketUnited Kingdom

Project overview

A compact footprint. The same industrial standard.

Canings Shop is a completed UK timber-frame project where a smaller footprint did not reduce the engineering standard. The building was delivered through a coordinated wall system with thermal, airtightness, structural and finishing layers defined as one package.

The project also marks a successful handover. The owner’s message thanking the ERGIO team and confirming that the keys had been received captures the point where controlled production becomes a finished building in the client’s hands.

Handover

“We formally have the keys.” A concise client message that confirms completion and closes the factory-to-site delivery cycle.

Canings Shop completed timber building in the United Kingdom
Canings Shop project handover
United Kingdom · completed timber projectFactory-controlled quality applied at compact scale.

Technical configuration

A fully coordinated envelope behind a simple timber exterior.

The technical build-ups below reflect the project information supplied for Canings Shop.

01

Exterior wall structure

45 × 145 mm timber frame

The exterior walls use 45 × 145 mm timber framing as the primary structural zone.

02

Exterior insulation

Glass mineral wool

Glass mineral wool is integrated within the exterior framing for the thermal build-up.

03

Envelope control

Vapour control + highly breathable membrane

Vapour control and a highly breathable external membrane coordinate moisture management through the wall package.

04

Sheathing & internal finish

OSB + plasterboard

OSB provides the specified sheathing layer, with plasterboard completing the internal face.

05

Exterior finish

28 mm vertical cladding

The external envelope is finished with 28 mm vertical timber cladding.

06

Interior walls

45 × 95 mm + acoustic insulation + OSB + plasterboard

Internal partitions combine 45 × 95 mm timber framing with acoustic insulation, vapour control, OSB and plasterboard.

Why this project matters

Small projects still demand disciplined engineering.

Canings Shop demonstrates that ERGIO applies the same production logic, technical consistency and quality control regardless of project scale.

01

Completed handover

The building reached formal handover with the keys transferred to the client.

02

Layer-by-layer coordination

Exterior and interior wall build-ups were specified as complete systems rather than disconnected materials.

03

UK market experience

The project adds another completed reference to ERGIO’s active UK portfolio.

04

Scalable expertise

The same know-how can support larger residential, hospitality and multi-unit timber developments across the UK.

Factory to handover

From coordinated timber package to keys in the client’s hands.

The project turns technical coordination into a completed handover through a clear sequence from production to installation.

01

Technical definition

Wall framing, insulation, control layers, sheathing and finishes are coordinated as one package.

02

Factory preparation

Timber elements are prepared under controlled production conditions.

03

Site execution

The prepared system supports a cleaner, more predictable construction sequence.

04

Handover

The completed building is transferred to the client, closing the delivery cycle with a tangible result.

UK timber delivery for professional partners.

Planning a larger residential, hospitality or multi-unit timber project in the UK?

Share the architectural and structural information. ERGIO can review how to translate the project into a factory-controlled timber package for reliable execution.

Start a Project

Share the essentials. If you already have drawings or project files, you can attach them below.